Quality Control & Time Management Checklists
A comprehensive series of
standardized checklists designed for use by Building Industry
professionals. Unlike some other vendors, our checklists come in
Microsoft Excel format. This means that they are ready for use
upon purchase and that no time (or money) is wasted learning new
software or converting paper documents. Our checklists are an
efficient and cost effective solution to your documentation
needs whether you are doing a survey of existing facility
conditions assessments to develop FCI (facility condition
indexing) or master planning. Our Assessment Checklists (sample)
have been in use years. Inspection Checklists (sample)
are used in the 3rd Party TAB process, 3rd Party Commissioning
process, and for design engineers construction phase field
reports and punch lists. Our equipment Startup Checklists (sample)
are also applicable to Construction phase assessment of “system
readiness” and can also be used by trade contractors completing
their own installation punch list documentation and sign-off.
A 4th series of Assessment Checklists is the Equipment Room and
Tunnel survey Excel documents that facility engineers,
out-source O&M technicians and contractors providing Project
Closeout documentation of these spaces.
Checklists Include:
- Equipment Rooms (5-checklists for surveying equipment rooms &
equipment tunnels)
- Startup (36-checklists for equipment startup)
- Assessment (40-checklists for assessing existing equipment
conditions)
- Inspection (46-checklists for construction progress and/or punch
list)
CAN BE LINKED TO "BIM" PROJECT DOCUMENTS!!
How much would it cost your firm to produce a library of quality
control, time management electronic documents created by
experienced professionals? We offer this collection of
electronic forms for $275.00 with each checklist formatted for
handheld or tablet computer application and include touch-screen
application for ease and accurate documentation.

Checklist Download
$275.00:

For more on the
success of using checklists read “The Checklist Manifesto – How
To Get Things Right” at
http://www.thechecklistmanifesto.com
“The volume and
complexity of knowledge today has exceeded our ability as
individuals to properly deliver it to the people-consistently,
correctly, safely.”
BuildingSmartSoftware endorses the book, “The Checklist
Manifesto – How To Get Things Right” by bestselling author Atul
Gawande. Checklists have been a time-tested, proven means
for achieving quality control, as well as an efficient,
time-management means to document one’s observations. Our
checklists are simply a beginning to further enhancements of
these electronic documents by those who use them and continue to
make them better for their specific business application.
Home