Commissioning -1

CX-1 is the commissioning module that contains most, if not all the documentation standards pertinent to the building system commissioning process. These documents follow the industry guidelines but go beyond suggested process to providing actual standardized templates to be used job after job. Whether you are an owner's representative, building owner, consulting firm, commissioning agent, trade contractor, design-builder, or construction manager, you need this module.

Unlike so many web sites with recommended methods of how to implement commissioning, Cx-1 provides the actual business tools to be able to deliver the process. The commissioning specification, in this module packages the commissioning plan and contract project requirements within a single section, Division 18000. While most commissioning approaches sprinkles the requirements through Division 01000, 15000, 16000, and 17000, Cx-1 compiles everything within one section and becomes the foundation to what will eventually be the Final Commissioning Report manual.

This module also includes many of the needed documents, logs, and checklists necessary to fulfill the requirements of the commissioning process. In addition, these electronic documents are ideally suited and address LEED™ certified projects where commissioning is a prerequisite and includes a suggested Systems Manual Table of Content for the Enhanced Commissioning credit.

Built on experience, continuously improved and enhanced on a regular basis with updates published as the process grows. Cx-1 is cost-effective and efficient, built standardization and an eye towards time management approach to the commissioning business.  

Here is what Commissioning-1 provides:

Division 18000-Commissioning Specification

Part 1-General
1.01 General Provisions & Goals
1.02 Commissioning Plan
1.03 Systems To Be Commissioned

Part 2-Process
2.01 Commissioning Team (see example)
2.01 Prefunctional Performance Test Checklists
2.02 Functional Performance Test Narratives

Part 3-Execution
3.01 Commissioning Team Responsibilities
3.02 Construction Document Phase
3.03 Construction Test Plan & Schedule
3.04 Commissioning of CMMS
3.05 Systems (Re-Commissioning Management) Manual
3.06 Prefunctional Performance Test (startup) Checklists
3.07 Functional Performance Test Narratives
3.08 Warranty Phase
3.09 Table of Content For Final Commissioning Report

Unique with Cx-1 is the assortment of electronic commissioning documents necessary to get the job done. These standards, checklists, and templates provide the commissioning team with the needed forms to quickly get up to speed with being proficient in the commissioning business.

Useful quality assurance documents include the following:

  • Commissioning Meeting Minutes Template
  • Contractor Kickoff Meeting Agenda and PowerPoint Presentation
  • Design Intent Document Template
  • Commissioning (Design) Review Checklist (see example) Useful for LEED™ certified projects
  • Pending Issues Log (for design issue RFI's and deferred/seasonal tests)
  • Shop Drawing (and O&M) Log
  • Commissioning Test Plan & Schedule
  • Contractor Test Log
  • Manufacturer's Start-Up Log
  • Prefunctional Performance Test Corrective Action Log
  • Functional Performance Test Corrective Action Log
  • Equipment & System Training Log
  • O&M Manual Checklist
  • Review Trending Checklist
  • Field Visit Report Template

Also provided is Commissioning of CMMS (computerized maintenance management software) system with specification inserts for Division 1, 15 and 16.


Home / Products / Contact Us