Commissioning -2
Based on experience and time-tested, these individual equipment checklists
can be edited on a job-by-job basis to assure the contractor will provide
the pertinent startup data necessary to confirm system readiness and help
the contractor to be prepared to move into the next phase of commissioning,
the Functional Performance Test demonstration.
Cx-2 contains a series of 30 electronic checklists to document the startup
procedures and punch list of equipment installation per contract
requirements. It also includes 36 equipment-specific checklists. This second module is ready for editing for each job and easy
to use with its "pass-fail" application that is ideally suited when
downloaded into a handheld computer or laptop computer. This module can be
useful for the facility manager, trade contractor, design engineer,
commissioning engineer, design-builder, general contractor, equipment
vendor, and construction manager. Commissioning-2 contains the Prefunctional Performance Test for the following equipment: For:
|
|