Products
Commissioning 1-2-3
Commissioning 1-2-3™ is a standard where no industry standard
exists. It is job-proven electronic approach to delivering full
service commissioning process separated into three distinct elements
of commissioning activities; 1) Documentation Templates, 2)
Equipment System Readiness Checklists , and 3) A Combined ATC/FPT
verification of system performance. Ideally suited for consulting
engineers, commissioning agents, facility managers, design-builders,
and construction managers who want to have a standardized
commissioning process for their use. Cx-3 is a software program.
TAB-3
TAB-3 is a first-of-its-kind system
flow diagram for design engineers and TAB engineers developing their
system flow diagrams that establishes and breaks out the air system
static pressure and total pumping system pump head.
Standardized
Checklists
Assessment-Inspection-Startup-Equipment Room Checklist publication on CD is a
series of 127 - standardized checklists designed for use by Building
Industry professionals. This means that they are ready for use upon
purchase and that no time (or money) is wasted learning new software
or converting paper documents. Our checklists are an efficient and
cost effective solution to your documentation needs. Ideally suited
for facility professionals, consulting engineers, trade contractors,
design-builders, and construction managers.
Publications
Managing People in the HVAC/R Industry
Process, Project, Profit - A Practitioner's Guide to the Building Industry,
that can be purchased chapter by chapter!
Engineered Systems
Magazine - For monthly Back to Basics Energy Retro-Commissioning multiple choice test and Tomorrow’s
Environment Columns along with Amanda McKew’s Facility File column.
|